3.5 hours on the rebuild and all is excellant
#1
3.5 hours on the rebuild and all is excellant
i am loving it I put my needle clip back in the 4th groove but I still have the 172.3 main in, hey how come some places mr hp suggests 175 main needle in bottom groove and another place 170 main needle 4th groove? I have read all the posts about jetting and with his endcap he suggests 170 main in summer needle 4th groove but I also have his ported intake and his 11.2:1 high comp. je piston in, would i need to rejet cause of these additional mods? thanks fellers, hey mudstud wanna line em up? lol
p.s. I have read all the posts about opening the vacum ports on the bottom of the slide and I am not sure if that really makes a difference, anybody do it?
p.s. I have read all the posts about opening the vacum ports on the bottom of the slide and I am not sure if that really makes a difference, anybody do it?
#2
3.5 hours on the rebuild and all is excellant
I don't worry, we will line up!! This saturday I am starting the work on it.. Starting with oil change and brake lines. Then I need a new pipe, grips, rear brakes, battery, fuel vent line and thats it!! I am gonna hate roosting that newly built DS of yours [img]i/expressions/face-icon-small-smile.gif[/img]
#3
3.5 hours on the rebuild and all is excellant
hey i was at my buddies today in baycity wi, driving on an old logging trail about 5 miles long trough a huge raveen man it was great he has a huge corn field maybe 2 miles long flat got to open it up today now i have 5.8 hours on the rebuild and it seems like it is geeting stronger everyday, i am gonna take pics tomorrow of the place and post them on my webshots page
Thread
Thread Starter
Forum
Replies
Last Post
fordfaithful21
Polaris Ask an Expert! In fond memory of Old Polaris Tech.
9
12-07-2015 05:52 PM
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)