99 sp500 left front hub- needs a doctor!
#12
Ok Here You go. Tourqe spindle nut to 160 to 170"lbs while continously rotating the hub. Step #2 Back of nut 1/5 turn. Step #3 Rotate axel several revolutions by raising the rear of the machine and rotating the rear wheels with the machine in gear. Step #4 Re-tourqe the hub nut to 108 to 144" lbs then install cotter pin if the pin does not go in tighten the nut slightly until the pin goes in. DO NOT GO OVER 144" LBS Refill hub after putting on cover with type F tranny fluid or hub fluid. DONE
Thread
Thread Starter
Forum
Replies
Last Post
RticKwad
Classifieds, Garage Sale & Swap Shop
0
Jul 21, 2015 03:00 PM
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)




